Section 1 :Project costs.
Block 8 : Economic aspects.
Section 1 : Project costs. [40 hours]
01. General introduction. (02 hours)
02. General sketch of the financial structures. (02 hours)
03. Short budget analysis. (02 hours)
04. Budget organisation. (02 hours)
05. Description of the local contributions. (02 hours)



