Block 5 : How the fourth block structures solve specific problems.
Section 1: Gender. [5 hours]
02.00 Hours analysis of Model material.
02.00 Hours in-depth analysis.
01.00 Report.
——————————————————————————————————
Section 2: Capacity building. [5 hours]
02.00 Hours: analysis of Model material.
02.00 Hours: in-depth analysis.
01.00 Report
——————————————————————————————————
Section 3: Credit crisis. [ Read more
Block 4 :The structures to be created.
Section 1. Justification of the order of sequence for the creation of the structures. [16 hours]
14.00 hours: Justification of the order of sequence for the creation of the structures.
02.00 hours : Preparation report.
Section 2 : Social structures. [16 hours]
Block 3 :Solutions to the problems
Value : 01 point our of 18.
Work foreseen: 36 hours out of 504.
- Section 1 : Anthropological analysis of the three levels of project structures. (Value 0.5 point) [16.00 Hours]
Section B : Solutions to the problems.
Third block : Solutions to the problems.
Section 1 : Anthropological analysis of the three levels of structures.
Section 2 : Division of responsibilities amongst the three levels of structures.
——————————————————————————–
Quarter 2.
Fourth block: The structures to be created.
14.00 hours: Justification of the order of sequence for Read more

